User manual ARROW NP108

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual ARROW NP108. We hope that this ARROW NP108 user guide will be useful to you.


ARROW NP108 : Download the complete user guide (875 Ko)

Manual abstract: user guide ARROW NP108

Detailed instructions for use are in the User's Guide.

[. . . ] Owner's Manual & Assembly Instructions A01 Model No. EN108-A NP108 SA108-A HM108-A NW108-A VN108-A MN108-A PD108-A 709291207 BUILDING DIMENSIONS * Size rounded off to the nearest foot CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. Size 10' x 8' Foundation Size 121" x 92 3/4" Storage Area Sq. [. . . ] 1 x 4's (2, 5cm x 10cm) (will be removed once the concrete cures) Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of: 1 part cement 3 parts pea sized gravel 2 1/2 parts clean sand Prepare the Site/Construct a Foundation 1. Construct a wood frame using four planks of 1x4 (2, 5cm x 10cm) lumber. Pour in concrete to fill in the hole and the frame giving a total of 4" (8-10cm) thick concrete. Be sure surface is level. 12 FRONT 3, 1" 1m (DOOR) " 3/4 92 4m 2, Note: Finished Slab dimensions, with lumber removed. Allow 3 - 5 hours for construction and a week for concrete curing time. 9 Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the sides, rear and front. Proceed as follows: 8937 9367 8934 9367 8936 Place the front floor frames as shown. Center the ramp, with drain holes facing outside, on top of the two front floor frames. Join the frames by inserting eight screws. 1 STEP 8934 9367 DRAIN HOLES FACE OUTSIDE 1 Front Floor Frame Assembly 119 3/8" 3, 0m 9367 2 Overlap the side floor frames and the rear floor frames as shown. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. See the illustrations below for the proper overall length of the side and rear floor frames. Join the frames by inserting four/five bolts into each frame set as shown. 8937 Side Floor Frame 91 1/8" 2, 3m STEP 8937 2 Rear Floor Frame 119 3/8" 3, 0m 8936 8936 3 Double check the length of each and set these pieces aside for later use. 91 1/8" 2, 3m 91 1/8" 2, 3m STEP 119 3/8" 3, 0m Front & Rear 119 3/8" 3, 0m 3 14 Step 2 A15 Parts Needed For Frame Assemblies 5986 Rear Wall Angle (2) 9917 Rear Wall Channel (2) 9922 Side Wall Channel (4) 8839 Side Wall Angle (4) The main frame pieces reinforce the walls. These pieces will later be installed in the center and at the top edge of the side walls and the rear wall. Proceed as follows: 9917 Rear Wall Channel 118 1/8" 3, 0m 9917 1 Overlap the rear wall channel pieces as shown in the figure and fasten the two pieces together with one bolt in the center hole (three holes will align). 9922 STEP STEP Side Wall Channels 89 7/8" 2, 3m 9922 2 Make two side wall channels by overlapping the side wall channel pieces as shown. Fasten each set together with one bolt in the center hole of each set. 1 5986 2 Rear Wall Angle 118 1/8" 3, 0m 5986 3 Overlap the rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole. Make two side wall angles by overlapping the side wall angle pieces as shown. Fasten each set together with one bolt in the center hole. 8839 STEP STEP Side Wall Angles 89 7/8" 2, 3m 8839 4 3 4 Rear Wall Channel 118 1/8" 3, 0m Side Wall Channels 89 7/8" 2, 3m 5 Set the assemblies aside. You will use them later. Rear Wall Angle 118 1/8" 3, 0m STEP 5 Side Wall Angles 89 7/8" 2, 3m 15 Step 3 D16 Parts Needed For Roof Beam Assemblies 10470 Roof Beam (8) The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. [. . . ] Do not fasten the lower end of the panel to the side wall angle at this time. Hint: Attach fasteners in order shown in diagram. FRON T Gable Nut Washer Bolt 26 Step 14 A27 Parts Needed For Roof Assembly 8468 Right Roof Panel (1) 8469 Left Roof Panel (2) 7483 Roof Panel (2) 6529 Roof Panel (2) 1 Install a left roof panel at the left rear and right front corner of the roof. Install a right roof panel at the left front corner of the roof. 8469 Left Roof Panel 7483 Roof Panel 6529 Roof Panel 8468 Right Roof Panel STEP STEP 1 2 Weather Stripping 7483 Roof Panel Tape Roll 6529 Roof Panel 2 Cut 4 short 2" (5cm) strips off the roll of weather stripping tape, and put them aside. Unroll the tape and press it down over the opening at the ridge as you install each roof panel. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE ARROW NP108




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual ARROW NP108 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.